Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 3.10pm, Saturday 8th September, 2012 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | garydawes |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Hebburn |
Tyne dock - Simonside cycleway. Take this path. Again completely unmarked
If travelling east, turn left for Simonside and Brockley Whins or turn right to Simonside Metro
Comments reflect the views of the original submitter only.